-
Northvolt AB
Connstruction for Turn-key dry room system and desiccant dehumidification equipment in Northvolt is almost finished.Pānuitia atu -
CATL(Qinghai factory)
we have supplied 14sets of desiccant dehumidifier for CATL(Qinghai factory) in 2018: ZCB-Z160-16000 1set ZCB-Z220-22000 1set ZCB-Z150-15000 2set ZCB-Z200-20000 1set ZCH-Z-7000X 1set ZCH-Z-35000S 1set ZCH-Z-20000S 2sets,ZCH-Z-18000S 1set ZCH-Z-7000S 3sets ZCH-D-1500X 1setPānuitia atu -
WHTB GLASS LLC
Turn-key dry air system(which include desiccant dehumidifier, air cooled chiller, air ductwork, water pipes and dry room) installed by Hangzhou Dryair is completed in WHTB GLASS LLC in Longisland ,New York successfully.Pānuitia atu -
CATL
CATL kī tuatahi i roto i te hanga pūhiko ā-tau i roto i te ao. A cooperates reira ki te pai-mohiotia carmakers kāinga, me te ao maha. Kua DRYAIR kua whakarato pūnaha dehumidification desiccant mo CATL mai 2017.Pānuitia atu -
Microvast, Inc. China Facility i Huzhou, Zhejiang Province
In 2014,Hangzhou Dryair’s Low Dew Point Desiccant Dehumidifier ZCH-15000,ZCH-18000 were used to supply low dew point air at -45℃(73F)for 1040 square meters (11200 square feet) Dry Room. In 2011, a turn key dry room of 7500 sq.feet including low dew point desiccant dehumidifiers ZCH-8000...Pānuitia atu -
Byd NEW ENERGY
Byd rite te ao ārahi kaiwhakarato otinga pūngao kei te tuku nei hua pūngao ki neke atu i te 30 whenua, me rohe i roto i te rima konitinēniti anake Antarctica. I roto i te 2014 tomairangi iti wāhi desiccant whakakore haukū ZCH-6000s (T: 20 ± 1 ℃, Td≤-50 ℃) I te 2009 iti tomairangi wāhi desiccant whakakore haukū ZCH-22000 (T: 20 ± 1 ℃, ...Pānuitia atu -
Saft Pūhiko, China
I roto i te 2015, 2sets o tomairangi iti misini ira desiccant ZCH-18000S mō te 4300square waewae * 8.8ft Runanga awheawhe 1 huinga o iti tomairangi ira desiccant whakakore haukū ZCH-15000S mō te 2690square waewae * 8.8ft konukōhatu Room WerohangaPānuitia atu -
Dow Chemical (Haina) Investment Company Limited
-
ATL
ATL he kaihanga ārahi o te ao, me te hou o te pākahiko lithium-katote. Kua DRYAIR kua whakarato pūnaha desiccant dehumidification mo ATL & CATL mai 2017.Pānuitia atu -
General Motors
General Motors (China) Investment Company Limited MODEL NO.:NMP RECOVERY SYSTEM JRH-2500 Condensing unit NC-16AS Cooling pipesPānuitia atu -
EVE pūngao
EVE Energy Co., Ltd EVE Energy Co., whakaturia Ltd i roto i 2001 me tohunga ana i roto te lithium nui-pūngao batteries.EVE ko te kaiwhakarato nui rawa o ngā pūtau lithium Paraimere i roto i China. I roto i te Oketopa 2009, ka EVE te kamupene tuatahi whakarārangitia i runga kōhatu i roto i Shenzhen (waehere Stock: 300014.SZ). I roto i te 2015 NMP ora ...Pānuitia atu -
Hefei Guoxuan Hi-tech mana pūngao
whakaturia Hefei Guoxuan High-tech Power Energy Co., Ltd Hefei Guoxuan High-tech Energy Power Co., Ltd. te i Mei, 2006, e ka kitea i roto i Yaohai rohe ahumahi, Hefei i Anhui kawanatanga. Ko te tikanga, noho nga wāhi hanga 100, 000 tapawha-mita. Ko te pūkete rēhitatanga he 50 miriona CNY, me ...Pānuitia atu -
Ganfeng konukōhatu
JiangXi Ganfeng lithium Co., Ltd ko te hinonga hi-tech i whakaturia i roto i 2000, pūtaiao hipoki, ahumahi me te hokohoko ki te rohe o 300 eka Hainamana, whakapaipai rēhita o 75.000.000 Yuan, 450 tokotoko, 160 o ratou he Engineers, tikanga me ngā kaiwhakahaere (80 o-te taumata tiketike, me te ti takawaenga ...Pānuitia atu -
BAK pūhiko
BAK pūhiko Shenzhen BAK ko te kaihanga ārahi ao o te lithium hāngai pūtau pūhiko, ona hua matua ngā porotakaroa, pūtau pūhiko prismatic me polymer e ko te wāhanga tino o pākahiko rechargeable nuitia whakamahia i roto i te waea pūtau, rorohiko pukatuhi me ngā raruraru kawe ...Pānuitia atu -
American Whakatio maroke
1 Room: T = 12-20 ℃, RH≤30% Rahi: 60.5 sq.m (636.5sq.ft) Teitei: 3.3m (11ft) 5 iwi ZCB-Z-3000 (3000CMH / 1764CFM) Room 2 T = 23 ± 1 ℃ RH≤1%, Td≤-35 ℃ i roto i te Rahi ruma maroke: 123sq.m (1312.5) Teitei: 3.3m (11ft) 3 iwi ZCB-Z-12000S (12000CMH / 7058CFM)Pānuitia atu -
Queesland University o Technology
1st Dry Room: T=20-22℃ RH≤30% in the dry room Size: 29 sq.m Height: 3m 2 people ZCB-D45-4500(4500CMH/2647CFM) 2nd Dry Room T=20-22℃ Td≤-45℃ RH≤0.5%in the dry room 41sq.m Height: 3m 2 people ZCH-4000S+FFU 2setsPānuitia atu -
Nanotek Instruments
1st Dry Room: T=23±1℃ RH≤10% in the dry room Size: 58.7 sq.m(630 sqare.foot) Height: 3m(9.84foot) 5 people ZCB-D45-4500(4500CMH/2647CFM) 2nd Dry Room T=23±1℃ RH≤1%, Td≤-35℃ in the dry room 128.7sq.m (1395 sqare.foot) Height: 3m(9.84foot) 7 people ZCH-8000S(8000CMH/4705CFM)Pānuitia atu -
General puritanga
1st Dry Room: Size: 37 sq.m(400 sqare.foot) Height: 3m(9.84foot) 5 people 2nd Dry Room 149sq.m (1600 sqare.foot) Height: 3m(9.84foot) 10 people T:18-22℃ Td≤-45℃ in the dry room Supply air: 18-22℃ Td≤-65℃ ZCH-D-28000S(28000CMH/16450CFM)Pānuitia atu -
Fergrove Pharmaceutical
raina capsule production: aho Production 1: T≤20 ℃ RH≤15% i roto i te Rahi ruma maroke: 96 sq.m Teitei: 2.5m ZCB-R-12000 (12000CMH / 7058CFM) raina Production 2st: T≤20 ℃ RH≤ 15% i roto i te Rahi ruma maroke: 96 sq.m Teitei: 2.5m ZCB-R-12000 (12000CMH / 7058CFM) raina Production 3st: T≤20 ℃ RH≤15% i roto i te ruma maroke ...Pānuitia atu